June 2025 Agenda
1 Extension Leads |
Extension cables are being used on a permanent basis. Three additional electrical outlets have been installed in the kitchen to remove the need for extension cables. |
2-4 Housekeeping |
Minimise the accumulation and storage of combustible materials near electrical equipment |
5 Means of Escape |
Locked gate in service yard |
6 Compartmentation |
Fire doors between function room |
7 Means of escape |
Sliding gate (corridor) |
8-9 Means of escape |
Materials restricting external escape route to the rear.Trip hazards (external works) |
10 Fire Warning |
Cabling should be secured to the walls and ceiling using fire resistant cable support clips (over changing room entrances) |
11 Compartmentation |
Compartmentation has been compromised by removing walls and installing roller shutters in between the bar and function room (this does not meet the specifications of 30-minutes fire resistance) |
12 Non-compliant fire doors |
Kitchen door, boiler room door, main function room doors, corridor doors, inner kitchen door. |
13 Compartmentation |
Voids (including voids left by electrician) |
14 Compartmentation |
Roof access points are not fire rated |
15 Compartmentation, Cavities and Voids |
Storage area next to stairs (corridor) – walls do not meet the required standard of compartmentation. |
16 Emergency Lighting |
Limited external emergency lighting. |
17 Emergency Escape Lighting |
Faulty equipment Repaired as part of electrical work recently carried out by SKU Electrical. |
18 Fire Warning |
Fire alarms and smoke detection required for the loft area, garage/store and cellar. It was recommended that the changing room are fitted with heat detectors but the Parish Council risk assessed this and decided not to proceed. |
19 Extinguishers |
Housekeeping (access to extinguishers)s. Improve signage. |
Detail |
Cost |
Status |
Completion Date |
Roof Bracing single storey loft space |
2,230.38 |
Approved |
Complete |
Loft Insulation (single storey) |
2,493.84 |
Approved |
In progress |
Replacement lead flashing |
1,060.00 |
Approved |
Complete |
Replacement guttering and downpipes |
2,000.00 |
Approved |
Start date not agreed |
Additional leadwork |
900.00 |
Approved |
Complete |
Light tunnels |
600.00 |
Approved |
Complete |
Second storey loft work to include bracing and insulation |
1,248.00 |
Approved |
Complete |
Garage works |
1,750.00 650.00 |
Approved Approved |
Work due to begin w/c 27 May 2025 |
Replacement windows |
4,179.00 |
Approved |
Pending |
Moss Removal |
|
|
Quotes pending (one requested and received) |
New Pathway |
|
|
Review specification |
External lighting pole (electrics) |
261.64 plus VAT |
Approved |
Not instructed Quantum Electrical awarded work 24 February 2025 |
External lighting pole (replacement) |
|
|
Quotes need to be obtained |
Electrical work carried out by SKU to include rewiring, repairs to emergency lights x 2, rewiring of hand dryers and downlights and replace extractor fan in the accessible toilet, 3-phase supply to the kitchen including new consumer units and three additional electric sockets in the kitchen |
12,901.00 |
Approved |
Complete |
Emergency Light Repairs – PC approved £50 per unit with Arion, March 2025. |
291.67 |
Approved |
Pending |
Removal of redundant water pipes |
2,600.00 |
Approved |
Complete |
Structural Engineers (compliance visit) |
950.00 plus VAT |
Approved |
Pending |
Refurbishments of changing room to children’s changing room |
|
|
Specification required |
Refurbishment of changing room to accessible changing room |
|
|
Specification required |
Replace flooring (function room through bar including accessible toilet) |
|
|
Specification required |
Repair of underground drains |
|
|
Quotes pending (five requested, none received) |
External works |
12,500.00 |
|
One quote received (two further quotes required) |
Replacement fire doors |
|
|
One quote requested |